Installation details of bathroom hardware

Release date:2022-07-01

  

In decoration, there are both large projects and small details. The installation of bathroom hardware is the detail of decoration construction. Although it is not allowed to consume a lot of manpower and material resources, it needs to be carefully handled, otherwise it may create various troubles for future home life. Next, Dongguan Fuding Metal Co., Ltd. will introduce some small details about the installation of bathroom hardware before and after, hoping to be helpful to everyone!

Before installing the faucet, it is necessary to thoroughly flush the water supply pipeline, remove impurities from the pipeline, and inspect the water supply pipeline for damage; When installing, be careful not to install the cold and hot water supply pipes upside down; After installation, remove easily clogged accessories such as the bubbler and shower to allow water to flow out before reinstalling.

Before installing the floor drain, the core of the floor drain should be removed to prevent debris from falling into it and affecting its effectiveness. The distance between the drainage pipe and the ground should be filled with cement mortar, and the drainage pipe should be raised. If the distance is close, the drainage pipe should be appropriately shortened to make the installation of the floor drain slightly lower than the ground.

After the installation of large products, bathroom fixtures need to be drilled on the wall with an impact drill before installation. It is recommended to ask a professional technician to use a glass drill bit to first drill holes in the tiles and then use an impact drill to drill cement, in order to avoid cracking the tiles. When installing, determine the position of water pipes and wires based on the water circuit and circuit diagram, and be sure to avoid water pipes and wires. In addition, it is not allowed to directly contact the hardware. It should be wrapped with a clean soft cloth before tightening.